Full metadata record
DC poleHodnotaJazyk
dc.contributor.authorKábele, Pavel
dc.contributor.authorEdl, Milan
dc.date.accessioned2019-09-02T10:00:16Z-
dc.date.available2019-09-02T10:00:16Z-
dc.date.issued2020
dc.identifier.citationKÁBELE, P., EDL, M. Increasing the Efficiency of the Production Process Due to Using Methods of Industrial Engineering. In: Proceedings of the 2nd International Conference on Design, Simulation and Manufacturing - DSMIE 2019. Heidelberg: Springer, 2020. s. 126-137. ISBN 978-3-030-22364-9 , ISSN 2195-4356.en
dc.identifier.isbn978-3-030-22364-9
dc.identifier.issn2195-4356
dc.identifier.uri2-s2.0-85067042501
dc.identifier.urihttp://hdl.handle.net/11025/34938
dc.format12 s.cs
dc.format.mimetypeapplication/pdf
dc.language.isoenen
dc.publisherSpringeren
dc.relation.ispartofseriesProceedings of the 2nd International Conference on Design, Simulation and Manufacturing - DSMIE 2019en
dc.rightsPlný text není přístupný.cs
dc.rights© Springeren
dc.titleIncreasing the Efficiency of the Production Process Due to Using Methods of Industrial Engineeringen
dc.typepostprintcs
dc.typepostprinten
dc.rights.accessclosedAccessen
dc.type.versionacceptedVersionen
dc.description.abstract-translatedThe thesis deals with the increase of production productivity using industrial engineering methods. Application of lean methods in production process and logistics. (predicate should be added). In the theoretical part of this thesis the knowledge (information in this case is better) drawn from technical literature in the field of industrial engineering is presented. In particular the problem of balancing the production line is described here. The right production cycle is a basic requirement for serial production. Process analysis and the right detail analysis of production operations is the main indicator for batching of the production cycle and the detection of bottlenecks. In the analytical part, an approach to resolving changes on the production line is described. Time analysis of layout changes and decision analysis are described. Narrow spots have been removed by various principles. There has been a change in the layout of the production line and the application of new technology in the control room. The entire study shows the practical verification of the acquired knowledge in the field of industrial engineering and subsequent application in real operation. The project was built on the REFA methodology that was important for balancing manufacturing operations. In order to achieve the optimum production cycle, the layout had to be changed. The new layout contained a decision analysis to determine the right solution. The whole study shows a systematic approach to applying the above methods. © Springer Nature Switzerland AG 2020.en
dc.subject.translatedOperationen
dc.subject.translatedBalancing Layouten
dc.subject.translatedProduction cycleen
dc.subject.translatedAnalysis Logistics Improvementen
dc.identifier.doi10.1007/978-3-030-22365-6_13
dc.type.statusPeer-revieweden
dc.identifier.obd43926567
dc.project.IDED2.1.00/03.0093/RTI - Regionální technologický institutcs
Vyskytuje se v kolekcích:Postprinty / Postprints (KPV)
OBD



Použijte tento identifikátor k citaci nebo jako odkaz na tento záznam: http://hdl.handle.net/11025/34938

Všechny záznamy v DSpace jsou chráněny autorskými právy, všechna práva vyhrazena.

hledání
navigace
  1. DSpace at University of West Bohemia
  2. Publikační činnost / Publications
  3. OBD