Full metadata record
DC pole | Hodnota | Jazyk |
---|---|---|
dc.contributor.author | Tímr, Jan | |
dc.contributor.author | Mužík, Václav | |
dc.date.accessioned | 2022-09-12T10:00:25Z | - |
dc.date.available | 2022-09-12T10:00:25Z | - |
dc.date.issued | 2022 | |
dc.identifier.citation | TÍMR, J. MUŽÍK, V. Role of Simulation of Power Output in the Design of Small-scale Hydro Power Plant. In Proceedings of the 2022 22nd International Scientific Conference on Electric Power Engineering (EPE 2022). Ostrava: VSB - Technical University of Ostrava, 2022. s. 1-4. ISBN: 978-1-66541-056-4 | cs |
dc.identifier.isbn | 978-1-66541-056-4 | |
dc.identifier.uri | 2-s2.0-85135119977 | |
dc.identifier.uri | http://hdl.handle.net/11025/49646 | |
dc.format | 4 s. | cs |
dc.format.mimetype | application/pdf | |
dc.language.iso | en | en |
dc.publisher | IEEE | en |
dc.relation.ispartofseries | Proceedings of the 2022 22nd International Scientific Conference on Electric Power Engineering (EPE 2022) | en |
dc.rights | Plný text je přístupný v rámci univerzity přihlášeným uživatelům. | cs |
dc.rights | © IEEE | en |
dc.title | Role of Simulation of Power Output in the Design of Small-scale Hydro Power Plant | en |
dc.type | konferenční příspěvek | cs |
dc.type | ConferenceObject | en |
dc.rights.access | restrictedAccess | en |
dc.type.version | publishedVersion | en |
dc.description.abstract-translated | Article focuses on importance of time power-output simulation performed in Matlab in order to identify real hydroelectric potential in selected locations of river flows in the Czech Republic. The difference of simulation and the usual total generated power in a time-period might play a significant role in decision making during realization of a small-scale hydro power plant. The greatest difference is the view on generation from the time perspective throughout the year which can show the critical periods in the year when the generation is low or when it’s maximal. This simulation approach also shows the difference between annual generated electricity using average flows and the actual hourly flows. In the modern plant design real data time simulation should play nowadays a stadard role. | en |
dc.subject.translated | hydro | en |
dc.subject.translated | power-plant | en |
dc.subject.translated | potential | en |
dc.subject.translated | small-scale | en |
dc.subject.translated | renewables | en |
dc.subject.translated | simulation | en |
dc.identifier.doi | 10.1109/EPE54603.2022.9814110 | |
dc.type.status | Peer-reviewed | en |
dc.identifier.obd | 43936532 | |
dc.project.ID | SGS-2021-018/Analýza, simulace a pokročilé vyhodnocení dodávky a spotřeby elektrické energie při dodržení optimálních spolehlivostních a kvalitativních parametrů s respektováním integrace obnovitelných zdrojů, akumulace a elektromobility do elektrizační soustavy při využití aktuálních, inovativních metod teoretického a aplikačního výzkumu v elektroenergetice | cs |
Vyskytuje se v kolekcích: | Konferenční příspěvky / Conference Papers (KEE) Konferenční příspěvky / Conference papers (RICE) OBD |
Soubory připojené k záznamu:
Soubor | Velikost | Formát | |
---|---|---|---|
Timr_Role_of_Simulation.pdf | 491,56 kB | Adobe PDF | Zobrazit/otevřít Vyžádat kopii |
Použijte tento identifikátor k citaci nebo jako odkaz na tento záznam:
http://hdl.handle.net/11025/49646
Všechny záznamy v DSpace jsou chráněny autorskými právy, všechna práva vyhrazena.